Firesafety certification
Certification GOST R
Custom Union

Expert examination of planning documentation



Expert examination of planning documentation

The design documentation of all High-Risk Facilities should be obligatory examined that allows finding out violation of the Industrial Safety Requirements stipulated by Rostehnadzor at the design stage.

Timely detection and elimination of Rostehnadzor’s requirements violation gives an opportunity not only to save lives and health of employees but also to avoid penalties of state control authorities.

Only competent specialist accredited in this field is able to make qualitative examination. The documents examination is labour intensive and large-scale process. The list of works depends on availability and type of the required documentation, peculiar character of enterprise, stages of entity activity.

The examination could be made as for the separate parts as well as for the whole entity.

The Obligatory examination is executed:

  • prior to beginning of construction, expansion, reconstruction, technical re-equipment, suspension, dismantling of production entity;

  • after appearance of additions, amendments in design documentation (it is possible at any stage of entity operation);

  • analysis and assessment is carried out upon examination of Industrial Security of design documentation;

  • optimization of accepted technological process;

  • description of basic explosive, flammable, toxic properties of raw materials, marketable product and wastes;

  • presence and lack of measured directed at provision of designing facility safety;

  • possibility of quick and safe termination shutdown of separate elements and areas of the facility in order to execute repair and emergency works;

  • optimization of applied design solutions with regard to layout of technological equipment;

  • safe and reasonable design solutions for location of buildings and installations;

  • comparison of proposed production method with other methods known in foreign practical experience;

  • provision of operational staff safe, adequate measures for breakdown allocation and elimination;

  • and others.

  • Order of procedure:

    • File an application by means of application form, email or telephone.

    • Agreement of procedure order, due time and cost of works.

    • Submission of all necessary documents.

    • Contract conclusion / works payment under contract.

    • Analyze of production status (if it is provided by certification procedure).

    • Execution, issue and registration permitting documentation.

On-line application